- Home
- Services
- Control panels
- APFC Panel
Control panel manufacturing
APFC Panel Manufacturer in Pune
An APFC panel automatically switches capacitor banks in and out to hold plant power factor near unity. It reduces the reactive power penalty on an industrial electricity bill. Ankai Automation builds APFC panels in Pune sized to the site load profile.
Ankai Automation · industrial automation manufacturer · Pune, Maharashtra · founded 2019 · ISO 9001:2015 · GST 27JOEPK8042H1ZN
What the build covers
Every APFC Panel from Ankai Automation is built to a drawing, tested before dispatch and commissioned on site. The scope below is what a standard order includes.
Capacitor bank staging
Steps sized to the load profile so the controller can track a varying demand without hunting.
Power factor controller
Automatic switching against a target power factor, with stage health monitoring.
Detuned reactors
Where harmonic content on the site would otherwise put the capacitor bank at risk.
Billing impact
Sized against the actual tariff structure and penalty threshold, not a generic target.
Built for Indian shop-floor conditions
Enclosures use CRCA sheet steel with a 7-tank powder coating process, specified by the humidity and dust load of the installation. That matters most in coastal and process environments, where untreated steel corrodes within a season.
Ankai Automation manufactures in Pune and serves the Chakan, Bhosari, Pimpri-Chinchwad, Talegaon and Ranjangaon belts directly, with regional coverage in Mumbai, Ahmedabad, Delhi NCR and Bengaluru.
Other panel types
Answers
APFC Panel — questions
What does an APFC panel save?
It removes or reduces the reactive power penalty on an industrial electricity bill by holding power factor near the tariff threshold. The saving depends entirely on the tariff, the current power factor and the load profile, so it is calculated per site rather than quoted as a rule of thumb.
Next step
Send us the load schedule
A costed scope needs the feeder list, the site conditions and the protocol requirement. Send those and you get a real number back.